The project included the renovation of the hall roof, the replacement of the roof domes and the installation of additional fall protection. In a record-breaking five months, we succeeded in installing around 1,340 panels with a total output of 590kWp on an area of 5,400m2.
A total of 8,000 meters of cable were laid and the system generates around 600,000 kWh of electricity per year. This corresponds to around a third of NARIDA's energy requirements.
In combination with the purchase of electricity from hydropower, NARIDA will be using renewable energies in the future, thereby setting a strong example for the future.
We are proud of this.
NARIDA Breaks New Ground: Solar Energy for a Sustainable Future
In spring 2024, NARIDA took a significant step towards sustainability and environmental protection. The construction of a photovoltaic system reduced the ecological footprint and increased energy efficiency.